Our professional project inspection is intended to ensure that the polyurea project as-built complies with the original project objectives and detail. It is intended to serve as a tracking metric to assist the applicator in the field with construction inspection.
It is beneficial to see a successful project take shape; the field is the location where problems and their results can be first identified. The more thorough an understanding of the management of the project, the more likely it is to find problems before they occur. In general, our project inspection contains:
. General Project Information
. Day of Inspection Personnel Information
. Site Documentation
. Inspection Report
- Description of work activities
- Equipment Log
- Labor Schedule
- Weather and site conditions
- In general, are the on-site Engineers Reports complete and acceptable
- Daily Reports
- Weekly Report
. Field Work Performance
. Material Control
. Overall Summary and Recommendation